Solar Road Stud

Short Description:

Solar road studs are devices used to enhance road visibility and safety, particularly during low-light conditions or at night. These studs are embedded in the road surface and are equipped with solar panels to harness sunlight during the day and convert it into electrical energy. The stored energy powers LED lights in the studs, making them visible to drivers.


Product Detail

Product Tags

solar road stud
WechatIMG164
WechatIMG165

Usage

    1, more than four lanes back and forth, but there is no isolation belt in the middle and insufficient light at night;

    2. At the intersection/zebra crossing (deceleration prompt);

    3. Turn the road sharply;

    4. Foggy areas (seaside, airport roads);

    5. kerbs of expressways and roads without street lights;

    6, elevated and tunnel entrance and exit guide line position;

    7, road island, vehicle diversion (around the triangle horizontal line);

    8. Railway turnouts;

    9, toll lane line

   10. Accident-prone areas;

   11. Urban sidewalks, park paths and other areas and roads that need to beautify night scenes.

WechatIMG166

FAQ

Q:Can I get a sample?

A:Yes,we can provide 5-10kg thermoplastic paint for free. However, shipping cost should be payment by customers.

Q:What are MOQ?

A:For our thermoplastic powder we don't have MOQ requirement. One bags are available and can be sold.

Q:What are payment term?

A:We accept Alibaba online payment .cash  ,TT and so on .

Q:How long will you prepare goods?

A:We have enough stock for most products and can arrange shipment within 3 -5days upon receiving your payment.as we are usually exported to all over the world ,

we could give you some area to reference , south east Asia countries are 7- 10days ,

Mid East countries are 15-25days,Africa countries are 25-35days , south America countries are30-35days .north America countries are 22-30 .European countries are 30-40 days.

Q:What kind of shipping method are provided?

A:We can provide EXW,FOB,CIF service,etc.If part of your order from other suppliers, you can let suppliers delivery goods to our factory and we can load goods to the container

in our factory, free of charge.

Q: can we make our logo package ?

A: it is according we cooperation, we are could make your brand bags, it is need 20days to printer the new design bags .but need you pay to the design cost.


  • Previous:
  • Next:

  • Write your message here and send it to us

    Products categories